5.86-Hectare Land Development, Villa de los Arcos, and “Coto del Rey” Sanitary Sewer
5.86-hectare development in Tepatitlán rated at 256 l/s, plus construction of the Coto del Rey sanitary sewer.
Category
- Year
- 2005
- Client
- Tepatl Construcciones
- Category
- Land Development
- Location
- Tepatitlán, Jalisco
Other projects in this category
9.66-Hectare Land Development, Valle de los Cactus, Phase 1 Zone 2
Full 9.66-hectare land development for IVEA: potable water and sewer networks, earthworks and complete hydraulic pavement.
I.V.E.A.Land Development, Residencial El Roquedal
Full residential subdivision development for MICA: earthworks, water and sewer networks, curbs, sidewalks and pavements.
MICAPicacho I Industrial Park
Industrial park development for MICA, with roadways and utility networks sized for heavy loads and industrial use.
MICA