9.66-Hectare Land Development, Valle de los Cactus, Phase 1 Zone 2
Full 9.66-hectare land development for IVEA: potable water and sewer networks, earthworks and complete hydraulic pavement.
- Year
- 2005
- Client
- I.V.E.A.
- Category
- Land Development
- Location
- Aguascalientes, Aguascalientes
Scope of work
Box cuts, clearing and grubbing, truck haulage and loading; trenching for potable water and sewer lines; installation of water mains, household connections and sewer piping; manholes, service connections and discharges; sanitary inspection boxes; backfill compacted with borrow material; subgrade and embankment forming; tepetate subbase; crushed-gravel hydraulic base; hydraulic concrete paving; prime coats; hydraulic surfacing; curbs, sidewalks and collectors.
Other projects in this category
Land Development, Residencial El Roquedal
Full residential subdivision development for MICA: earthworks, water and sewer networks, curbs, sidewalks and pavements.
MICAPicacho I Industrial Park
Industrial park development for MICA, with roadways and utility networks sized for heavy loads and industrial use.
MICA5.86-Hectare Land Development, Villa de los Arcos, and “Coto del Rey” Sanitary Sewer
5.86-hectare development in Tepatitlán rated at 256 l/s, plus construction of the Coto del Rey sanitary sewer.
Tepatl Construcciones