Earthworks, Drainage and Paving, Rincón de Romos–Ciénega Grande Section
Highway section from km 35+700 to 36+420: box cuts, borrow material and embankment forming.
Category
- Year
- 2005
- Client
- PAVYCONSA
- Category
- Earthworks & Earth Moving
- Location
- Rincón de Romos, Aguascalientes
Other projects in this category
Underpass at Adolfo López Mateos and Manuel Gómez Morín Avenues, with Storm Sewer
Underpass at one of the busiest intersections in the city of Aguascalientes, with trench excavation for a storm sewer and embankment forming.
PAVYCONSA“Montoro” Interchange Structure, km 525+079, Aguascalientes Bypass
Highway interchange on the Aguascalientes Bypass (Zacatecas origin): box cuts, borrow material, embankment forming, bases and prime coat.
PAVYCONSANissan Mexicana: Noise Test Track for the Model XII, Cuernavaca
Test track for the Nissan Mexicana plant in Cuernavaca, Morelos, built to test-surface tolerances for embankment, subbase and base.
PAVYCONSA