Nissan Mexicana: Noise Test Track for the Model XII, Cuernavaca
Test track for the Nissan Mexicana plant in Cuernavaca, Morelos, built to test-surface tolerances for embankment, subbase and base.
Category
- Year
- 2006
- Client
- PAVYCONSA
- Category
- Earthworks & Earth Moving
- Location
- Cuernavaca, Morelos
Other projects in this category
“Montoro” Interchange Structure, km 525+079, Aguascalientes Bypass
Highway interchange on the Aguascalientes Bypass (Zacatecas origin): box cuts, borrow material, embankment forming, bases and prime coat.
PAVYCONSAUnderpass at Adolfo López Mateos and Manuel Gómez Morín Avenues, with Storm Sewer
Underpass at one of the busiest intersections in the city of Aguascalientes, with trench excavation for a storm sewer and embankment forming.
PAVYCONSAModernization and Widening of the San José de Gracia–Pabellón de Arteaga Boulevard, km 7+300 to 10+100
State-level boulevard widening with rock cuts, base and subbase forming and paving, contracted by the State Public Works Ministry.
Secretaría de Obras Públicas del Estado