Modernization and Widening of San José de Gracia Blvd., Section 6 (km 7+300 to 10+100), Rincón de Romos
Box cuts, borrow material, drainage works and embankment forming.
Category
- Year
- 2008
- Client
- Constructora COPRESA
- Category
- Earthworks & Earth Moving
- Location
- Rincón de Romos, Aguascalientes
Other projects in this category
Modernization and Widening of the San José de Gracia–Pabellón de Arteaga Boulevard, km 7+300 to 10+100
State-level boulevard widening with rock cuts, base and subbase forming and paving, contracted by the State Public Works Ministry.
Secretaría de Obras Públicas del Estado“Montoro” Interchange Structure, km 525+079, Aguascalientes Bypass
Highway interchange on the Aguascalientes Bypass (Zacatecas origin): box cuts, borrow material, embankment forming, bases and prime coat.
PAVYCONSANissan Mexicana: Noise Test Track for the Model XII, Cuernavaca
Test track for the Nissan Mexicana plant in Cuernavaca, Morelos, built to test-surface tolerances for embankment, subbase and base.
PAVYCONSA