Sewer Network Construction, Several Streets
Sanitary sewer network for the Municipality of Asientos.
Category
- Year
- 2020
- Client
- H. Ayuntamiento de Asientos
- Category
- Water & Sanitation Infrastructure
- Location
- Asientos, Aguascalientes
Other projects in this category
Right-Bank Collector from Santa Elena Levee to Parque México, Manholes 80 to 68, Guadalupano Blvd.
Phase 6 of the right-bank collector for CCAPAMA, with reinforced-concrete pipe, box-type manholes, potable water lines and restoration of hydraulic and asphalt concrete.
C.C.A.P.A.M.A.Construction of the “El Cedazo” Trunk Sewer
Large-diameter trunk sewer for CCAPAMA, including variable-depth trench excavation, a reinforced-concrete pump chamber and full pavement restoration.
C.C.A.P.A.M.A.Potable Water Network Construction, Villa Juárez (C.B.T.A. 40)
Potable water network on several streets in Villa Juárez for the Municipality of Asientos.
H. Ayuntamiento de Asientos