Sanitary Outfall Construction, Palo Alto, El Llano
Sanitary outfall with PVC and ADS pipe in several diameters, reinforced-concrete pump chamber, manholes and pavement restoration.
Category
- Year
- 2007
- Client
- Máquinas y Servicios
- Category
- Water & Sanitation Infrastructure
- Location
- El Llano, Aguascalientes
Other projects in this category
Right-Bank Collector from Santa Elena Levee to Parque México, Manholes 80 to 68, Guadalupano Blvd.
Phase 6 of the right-bank collector for CCAPAMA, with reinforced-concrete pipe, box-type manholes, potable water lines and restoration of hydraulic and asphalt concrete.
C.C.A.P.A.M.A.Construction of the “El Cedazo” Trunk Sewer
Large-diameter trunk sewer for CCAPAMA, including variable-depth trench excavation, a reinforced-concrete pump chamber and full pavement restoration.
C.C.A.P.A.M.A.Sanitary Outfall Construction, Tanque Viejo, Asientos
600 linear meters of sanitary outfall with ADS and PVC pipe, trench backfill with compacted tepetate and manhole construction.
Máquinas y Servicios